COMPLETED PROJECTS
Completed Projects
Özdoğanlar Taah. İnş. San. ve Tic. A.Ş
Copleted Projects |
EMPLOYER |
NAME |
CONTRACT DATE |
COMPLETION DATE |
CONTRACT VALUE (TL) |
FINAL ESTIMATION SUM ($) |
Ministry Of Public Works General Directorate Of Highways, Highways 15 th Regional Directorate
KASTAMONU |
Çaycuma - Perşembe - Bartın Road
(Between Çaycuma - Perşembe)
Leveling Art Structures And Upper Structures Works
KASTAMONU |
19/01/1998 |
21/11/05 |
183.294.21 TL
(1997 B.F) |
277.287.29 TL
1.295.075 $ |
İller Bank General Directorate |
ACIGÖL (Nevşehir) Sewerage Construction Works |
23/03/00 |
13/01/05 |
1.039.350.00 TL
(1999 B.F) |
978.182.86 TL
1.663.407 $ |
AKTÜRK Construction Industry and Trade Co. Inc |
AŞTİ Çayyolu 1 st Stage Rail System Lines Construction and Building Works
(Excavation Reinforcement Works) |
18/11/02 |
19/01/04 |
800.000 $ |
633.925 $ |
Ankara Water and Sewerage Administration General Directorate Channel Investment Department |
Ankara- Kazan Road Between Demetevler Crossroad - Highway Croosroad
KM: 3+969 - 21+437
Road Expansion, Rain Water, Waste Water Sewerage And Portable Water System Construction Works |
23/01/03 |
01/08/04 |
23.560.000.00 TL
(2002 B.F) |
41.087.164.86 TL
25.019.312 $ |
Ministry of Resettlement And Public Works Structural Works General Directorate |
Ankara Güvercinlik Gendarmarie Military Equipment Main Repair Factory Command, Workshop Building Construction Works |
12/12/01
Söz. Dev. Tar.
13/05/03 |
30/12/04 |
2.183.000.00 TL
(2001 B.F) |
2.052.000.000 TL
1.425.428 $ |
Ministry Of Public Works General Directorate Of Highways, Highways 15 th Regional Directorate
KASTAMONU |
Çaycuma - Perşembe - Bartın Road
KM: 0+000 - 10+000
Leveling Art Structures And Upper Structures Works |
04/11/03 |
20/12/04 |
976.173.75 TL
(2003 B.F) |
960.184.03 TL
649.251 $ |
Ministry Of Public Works General Directorate Of Highways, Highways 2nd Regional Directorate
İZMİR |
Aliağa - Ayvalık 14 th Region Hd. Road
KM: 80+000 - 101+000
Leveling Art Structures And Upper Structures Works
İZMİR |
11/02/04 |
10/05/05 |
3.705.078.25 TL
(2003 B.F) |
3.866.013.10 TL
2.614.094 $ |
TCDD General Directorate
( OHL - ALSİM ALARKO - GYO Joint Venture ) |
Rehabilitation Project Of Ankara - Istanbul Railway. Earthworks 1 Btw.
KM: 353+000 - 375+000
KM: 375+000 - 388+000
Art Structures, Embankment Works Between
KM: 375+400 - 388+000 |
14/05/04 |
14/07/04 |
2.889.080 € |
2.889.080 € |
Ankara Water and Sewerage Administration General Directorate Channel Investment Department |
1011 Bridge Cross Road And Substructure Replacement Construction Works |
16/05/05 |
21/06/06 |
15.336.386.24 TL |
16.855.596.06 TL
12.249.706 $ |
YDA Construction Industry And Trade Co. Inc. |
Concasor And Mechanic Plant Operating And Transportation of Material To The Employer Site For Dalaman Air Port New Outer Lines Terminal Building And Other Related Structures |
23/11/04 |
23/05/05 |
6.675.000.00 TL
(2004 B.F) |
6.675.000.00 TL
4.634.567 $ |
Capital City Organized Industrial Region
(SİTİYAK) |
Capital City OSB Completion Of Excavation And Filling Works |
20/05/04 |
14/10/04 |
875.000.00 TL
(2004 B.F) |
875.000.00 TL
564.623 $ |
Ankara Water and Sewerage Administration General Directorate Channel Investment Department |
Ankara - Istanbul Road 2 nd Group 7 Units Pedestrian Top Passing Steel Construction |
01/06/05 |
03/12/05 |
2.940.000.00 TL
(2005 B.F) |
2.582.631.00 TL
1.899.691 $ |
Ankara Water and Sewerage Administration General Directorate Channel Investment Department |
1011 Crossroad 3 Units Pedestrian Top Passing Steel Construction |
22/08/05 |
29/01/06 |
1.175.000.00 TL
(2005 B.F) |
1.136.225.00 TL
834.723 $ |
Ankara Water and Sewerage Administration General Directorate Channel Investment Department |
Ankara Big City Municipality Various Region Street And Road Sewerage And Rainwater Project And Substructure Sewerage Construction |
17/10/05 |
26/06/07 |
44.484.764.45 TL
|
53.351.688.62 TL
39.385.566.67 $ |
Ankara Water and Sewerage Administration Water Construction Department |
Mounting, Laying and Cathodic Protection of the Steel Pipe To Be Supplied for the Main Transmission Line to Deliver Water from Kesikköprü Dam to Ankara Ivedik Treatment Plants |
11/05/07 |
15/12/07 |
23.250.500.00 TL |
77.104.107.98 TL
57.527.557.20 $ |
ETİ Maden Operation General Directorate Bigadiç Boron Operation Directorate
BALIKESİR |
Bigadiç Boron Operation Directorate Measured Weighted Steel Yard Simav Open Quarry With 42.000.000 Tones Capacity Decoupage Work |
03/02/06 |
21/02/08 |
50.400.000.00 TL |
50.400.000.00 TL
38.202.076 $ |
|
|