COMPLETED PROJECTS
Completed Projects
Özdoğanlar Taah. İnş. San. ve Tic. A.Ş
Completed Projects
EMPLOYER NAME CONTRACT DATE COMPLETION DATE CONTRACT VALUE (TL) FINAL ESTIMATION SUM ($)
EGO General Directorate
(Bayındır - Yüksel Joint Venture)
Execution of Excavation And Filling Works At Stations And Lines For Ankaray,
(Ankara Light Rail Collective Transportation System) Transportation of Materials Extracted From the Excavation And Stake Forage Works
06/10/1992
06/10/1992
04/01/1993
07/07/1993
31/12/1993
31/01/1995
31/01/1995
31/01/1995
2.000.000 DM
6.600.00 TL (1992)
21.288.152 TL (1993)
11.250.00 TL (1993)
3.440.000 DM
52.458.29 TL | 6.692.569 $
21.288.15 TL | 2.415.173 $
13.896.41 TL | 1.205.043 $
Rural Services General Directorate Çanakkale - Ezine - Şapköy Artificial Lake Construction Works 30/11/1995 08/01/01 35.643.43 TL
(1995 B.F)
30.536.51 TL
560.694 $
Ankara Water and Sewerage Administration General Directorate Channel Investment Department Yenimahalle Alınteri Boulevard (Between Macun Greek - Ostim) Rain Water, Özevler Quarter, Alınteri Boulevard Rain Water Discharge Line and Closed Channel (Tunnel) Construction Works 16/10/1996 26/11/1997 44.000.00 TL
(1996 B.F)
59.441.35 TL
650.856 $
Former Çeltek Coal Administration Directorate of Amasya
Governorship Provincial Directorate
Decaupage - Coal Excavation - Loading And Transportation Works At 55 and 57 Numbered Open Quarries 25/07/1997 14/11/1998 235.000.00 TL
(1997 B.F)
305.499.89 TL
1.925.500 $
Ministry Of Public Works General Directorate Of Highways, Highways 15 th Regional Directorate
KASTAMONU
Devrek Provincial Crossing
KM: 1+590 - 2+320 Leveling Works, Art Structures Construction Works
30/09/1998 23/07/1999 119.590.64 TL
(1998 B.F)
146.292.97 TL
Ministry Of Public Works General Directorate Of Highways, Highways 15 th Regional Directorate
KASTAMONU
Zonguldak - Devrek 4 th Region Border Road Filling Works At Bridge Approach At
KM: 41+000 - 61+000
23/06/1998 08/09/1998 26.824.38 TL
(1998 B.F)
34.582.81 TL
130.560 $
Ministry Of Public Works General Directorate Of Highways, Highways 15 th Regional Directorate
KASTAMONU
Zonguldak - Devrek 4 th Region Border Road Filling, Demolition of Concrete Wall and Bridge Works At Bridge Approach At
KM: 41+000 - 61+000
09/10/1998 15/12/1998 65.787.73 TL
(1998 B.F)
59.824.07 TL
216.589 $
Ministry Of Public Works General Directorate Of Highways, Highways 15 th Regional Directorate
KASTAMONU
Kastamonu - Çankırı and Taşköprü Road Leveling, Art Structures And Upper Structure Works 30/12/1999 29/08/00 78.729.93 TL
(1999 B.F)
102.281.32 TL
189.376 $
İller Bank General Directorate Çalıca (Yalova) 2 nd Section Permanent Earthquake Residence Infrastructure Construction Works 06/06/00 17/10/01 1.850.000.00 TL
(1999 B.F)
+
%30 Keşif Artışı
+
1. Ek Sözleşme
Toplam : 3.600.000.00 TL
2.407.868.21 TL
3.275.070 $
İller Bank General Directorate Adapazarı (Merkez) 17 Numbered Network Lines Sewerage Construction Works 08/11/1999 20/06/02 382.050.00 TL
(1999 B.F)
+
%30 Keşif Artışı
+
1. Ek Sözleşme
Toplam :
772.500.00 TL
608.638.00 TL
1.184.877 $
Ministry Of Public Works General Directorate Of Highways, Highways 15 th Regional Directorate
KASTAMONU
Ilgaz Mountain Landslide Earth Works, Art Structures and Upper Structure Works 17/09/99 26/10/99 74.996.51 TL
(1999 B.F)
37.030.35 TL
80.783 $
TÜRKKONUT (Turkey S.S. Construction Cooperatives Central Union) Eryaman 1 st Section Road and Art Structures Supply Construction Works 03/08/00 30/09/00 400.000.00 TL
(2000 B.F)
973.616.08 TL
1.494.817 $
Sitiyak Industrialist Businessmen Collective Work Place Construction Cooperative Road, Sewerage, Rain Water Facilities and Connections of Such Facilities At SİTİYAK
Industrialist Businessmen Collective Work Place Construction Cooperative Industrial Area
06/01/00 13/07/00 340.000.00 TL
(2000 B.F)
371.292.05 TL
665.539 $
Sitiyak Industrialist Businessmen Collective Work Place Construction Cooperative Road, Sewerage, Rain Water Facilities and Connections of Such Facilities At SİTİYAK
Industrialist Businessmen Collective Work Place Construction Cooperative Industrial Area
13/07/00 25/12/00 340.000.00 TL
(2000 B.F)
211.706.82 TL
333.813 $
General Directorate of Highways
(Göçay - Güriş Joint Venturei)
Bursa - Periphery Road Yalova Seperation - Turanköy Crossroad With Bridge Road Construction Work 02/05/02 31/03/03 8.700.000.00 TL
(2002 B.F)
7.949.655.45 TL
5.626.200 $